Cedar Drive Project

home-alertCOVID-19: Things are evolving daily and the page below may not be current, get the latest updates on City facilities, services and programs at coquitlam.ca/covid19.

Note also that many services are available online to continue to serve the community at this time.

The Cedar Drive Project will provide critical utility servicing and DCC works along Cedar Drive in the area east of Burke Mountain Village. Planning for this project began approximately ten years ago, and now has transitioned to the design and construction stage. This will be the largest and likely the most complex project that will be delivered by the City’s Engineering & Public Works department in the current 5-year capital plan.

The objectives of the Cedar Drive Project are as follows:

  • Construct trunk sanitary sewer facilities along Cedar Drive and extending to Upper Victoria Drive, to serve existing and new development in the eastern part of the Partington Creek Neighbourhood.
  • Construct a flood channel and environmental works along the upper section of Cedar Drive, to convey existing and future flows in Partington Creek as well as raise Cedar drive by 1.5 metres to mitigate flood impacts from freshets in the Pitt River/Fraser River system.
  • Enhance the environmental conditions in Partington Creek, including installation of riparian areas, to provide an “offset” to impacts from the development planned in the area, as outlined in the Partington Creek Integrated Watershed Management Plan.
  • Upgrade the upper section of Cedar Drive as a transportation corridor to a two lane width, as well as constructing a multi-use pathway and street lighting.

Timeline

The schedule for delivering this project is to complete the property acquisition and detailed design in 2020, arrange for permitting and begin some of the construction in 2021, primarily stockpiling of fill for road building. The majority of the construction will occur though 2022 with final completion in 2023. A public information session is planned for early 2021 to provide an update to the community on this project before construction starts.

Background

Major engineering infrastructure is vital for the planned development envisioned in the Northeast Coquitlam Area Plan (NECAP).  Since NECAP’s adoption in 2002, construction of arterial roads and trunk utility facilities, mainly funded from Development Cost Charges (DCC), has progressed eastward in coordination with neighbourhood planning.  The next expansion of engineering infrastructure will be within the eastern portion of the Partington Creek Village Neighbourhood, which will support new development in that area.  A key component of this expansion of services is the Cedar Drive Project.