News Flash Home
The original item was published from 12/11/2023 10:57:37 AM to 12/12/2024 12:00:00 AM.

News Flash

City News

Posted on: December 11, 2023

[ARCHIVED] December 11 Update on Incident at 500 Foster Avenue

A photo showing where the raod has opened Following previous statements, the City of Coquitlam is providing an update on the geotechnical issue at the Amacon Construction Ltd. development site at 500 Foster Avenue in Coquitlam.

COQUITLAM, B.C., December 11, 2023 – Following previous statements, the City of Coquitlam is providing an update on the geotechnical issue at the Amacon Construction Ltd. development site at 500 Foster Avenue in Coquitlam.

Traffic Update

Following confirmation from both the original and third-party geotechnical engineers, the two westbound lanes on Foster Avenue (between North Road and Whiting Way) have been reopened to vehicle traffic as of this morning. The eastbound lane will remain closed as we continue to ensure site and public safety while remediation of the shoring wall is completed. Bus Route 157 will continue to be rerouted via Robinson Street and Smith Avenue in both directions.

Location Map (PDF)

Site Update

Placement of backfill to support the area of shoring wall failure and ensure the stability of Foster Ave is complete. This will allow the developer to safely advance the shoring wall repair. The geotechnical engineers have developed a remediation strategy for the shoring wall so on-site repair work will be proceeding.

The site remains safe and active as re-excavation and remediation of the shoring wall is anticipated to begin this week. There continues to be no expected risk to public safety, infrastructure or buildings beyond the immediate area of failure and both geotechnical engineers will continue to monitor and report on this work.

Neighbourhood Impacts

Coquitlam joins Amacon Construction Ltd. once again in thanking the neighborhood for their patience throughout these interruptions as we work together to resolve this.

In accord with Coquitlam’s Good Neighbour Construction Policy, Amacon has been in communication with property management companies in the area to keep neighbouring residents up to date on work-related impacts. After-hours and overnight work is not expected to continue regularly at this time. Residents can reach out to foster@amacon.com for further updates.

The City will also continue to provide the broader community with updates on traffic and the City’s role in this matter via posts on coquitlam.ca/FosterAvenue.

Background

In the early evening of Wednesday, November 29, City of Coquitlam staff were made aware that the shoring wall (i.e. the temporary wall that supports a construction site during excavation) on the north end of the site had started to fail. 

Foster Avenue was closed and work began immediately to fix the shoring wall to ensure no further failures. 

WorkSafe BC attended the site to inspect the incident, and provided instruction for the safe operation of the site. They allowed work on the site to continue under the supervision of the site’s geotechnical engineer, GeoPacific, in order to stabilize the wall.

Thankfully, no one was injured and there was no known damage to City roads or underground infrastructure. It is not expected that there is any risk to infrastructure or buildings beyond the immediate area of failure and no significant movement has been observed on the adjacent shoring walls.

Repairs to the shoring walls are being actively supervised by the original geotechnical engineer with an independent third-party geotechnical engineer reviewing and providing oversight of repairs.  While this is not standard practice, City officials felt it was important to ensure there was trust in the protection of City infrastructure and the surrounding neighbourhood.

It is important to note that a shoring wall is a temporary wall installed during excavation and is not the permanent foundation wall for the building, which would be subject to the BC Building Code and City oversight. The BC Building Code does not govern the shoring system. This is within the mandate of the site’s geotechnical engineers who have their own high standards and codes of ethics to ensure safety in these situations.

Residents with questions and concerns related to this development project can contact the City’s Planning and Development team at 604-927-3430 or devinfo@coquitlam.ca. After-hours concerns can be directed to the City’s 24/7 Engineering and Public Works customer service at 604-927-3500 or epw@coquitlam.ca.

Media Contact
Doug Vance
Building Permits Manager
media@coquitlam.ca

We acknowledge with gratitude and respect that the name Coquitlam was derived from the hən̓q̓əmin̓əm̓ (HUN-kuh-MEE-num) word kʷikʷəƛ̓əm (kwee-KWET-lum) meaning “Red Fish Up the River”. The City is honoured to be located on the kʷikʷəƛ̓əm traditional and ancestral lands, including those parts that were historically shared with the q̓ic̓əy̓ (kat-zee), and other Coast Salish Peoples.


Additional Info...
Facebook Twitter Email

Other News in City News

A photo of the mural called

Art on the Move – Discover Coquitlam’s New Public Art Tour

Posted on: May 1, 2025 | Last Modified on: May 1, 2025
A large crowd gathers at an outdoor event during twilight to watch fireworks, with city buildings in

Partner with Coquitlam and Make a Lasting Impact

Posted on: April 23, 2025 | Last Modified on: April 23, 2025
Park Spark team member with residents in park observing flaura

Coquitlam Celebrates Earth Day

Posted on: April 14, 2025
Hand holding cell phone with Coquitlam Curbside Collection App on screen

Go Green and Opt Out of the Paper Collection Calendar

Posted on: March 21, 2025 | Last Modified on: March 21, 2025
A young bear cub eating trash out of a black garbage bag

Help Bears Find Natural Food Sources

Posted on: March 12, 2025
Little library

Apply for a Neighbourhood Small Grant

Posted on: March 6, 2025 | Last Modified on: March 6, 2025
Public works staff unspooling a cable/hose

Utility Bills Are in the Mail

Posted on: February 26, 2025
Public Service Advisory Graphic

Public Service Advisory: Coquitlam Prepared for Winter Weather

Posted on: January 30, 2025 | Last Modified on: January 30, 2025
Lafarge Lake at dusk with a sunset and seasonal light display

Coquitlam Winter Holiday Hours

Posted on: December 20, 2024 | Last Modified on: December 20, 2024
Public Service Announcement graphic

PSA: Financial Aid Available for Eligible Flood-impacted Residents and Businesses

Posted on: December 9, 2024 | Last Modified on: December 9, 2024
A photo of the mural

New Mural Project Brings City Council, Youth and United Way BC Together

Posted on: December 4, 2024 | Last Modified on: December 4, 2024
Truck decalled with

Coquitlam’s New Garbage Collection Fleet is Wrapped for Education

Posted on: November 21, 2024 | Last Modified on: November 21, 2024
Sequoia Tree Transplant near Lafarge Lake

City Grows its Family of Trees

Posted on: October 2, 2024
Cyclists at HUB Cycling Celebration Station Burquitlam Station

Join Coquitlam during Go by Bike Week

Posted on: September 20, 2024
Bylaw enforcement office chatting with driver of vehicle in a school loading zone

Stay Alert for Back-to-School Students

Posted on: August 28, 2024
Fire Risk Rating Gauge. Current level is high.

Coquitlam Ramps Up Fire Prevention Measures in Parks and Green Spaces

Posted on: July 11, 2024 | Last Modified on: July 11, 2024
Mundy Park 3 - Newsflash

Mundy Park Pool Update

Posted on: July 11, 2024
Be fire safe during home renovation and construction

Reduce Fire Risks during Summer Renovation Projects

Posted on: June 24, 2024 | Last Modified on: June 24, 2024
Rocking horse for sale along with other knick knacks.

City-Wide Garage Sale and Giveaway Event this Weekend

Posted on: May 24, 2024 | Last Modified on: May 24, 2024
Hand holds a credit card hovering over a keyboard

Property Tax Notices Are in the Mail

Posted on: May 22, 2024 | Last Modified on: May 22, 2024