News Flash Home
The original item was published from 6/23/2021 10:00:29 AM to 6/24/2022 12:05:00 AM.

News Flash

City News

Posted on: June 23, 2021

[ARCHIVED] Fun New Features Planned for Spani Pool Upgrade

Spani Pool Renewal Rendering Newsflash A new leisure pool with beach entry, water spray features and new hot pool are among the proposed plans for Coquitlam’s Spani Pool.

COQUITLAM, B.C., June 23, 2021 – A new leisure pool with beach entry, water spray features and new hot pool are among the proposed plans for Coquitlam’s Spani Pool.

The City consulted hundreds of residents, recreational and competitive swimmers, and other stakeholders from summer 2020 to spring of 2021 on the planned renewal of the 50-year-old pool in Mundy Park. Refurbishing Spani into a fun, inclusive and sustainable outdoor pool between 2021 and 2025 is a priority project in Coquitlam’s Parks, Recreation and Culture Master Plan and its 25-year Aquatic Services and Infrastructure Strategy. 

Renewing a Community Asset

The City launched the renewal study in spring 2020 to define the upgrades and cost of renewing the pool, which features a 25-metre lap pool, dive tank, changerooms and washrooms. 

Spani is used primarily for recreation swimming, as well as a variety of other uses such as lessons, fitness, play and competitive swimming. Spani has been the Coquitlam Sharks Swim Club’s home pool for the last five decades for its meets and training. 

Public engagement included a community survey, dedicated engagement page at www.letstalkcoquitlam.ca/spani and direct consultation with the Sharks, Storm Water Polo Club, Aquasonics Synchronized Swimming Club, Tri-City Triathletes Club, Hyack Swim Club and the City’s Aquatic Recreation team. Sessions also took place with the City’s Universal Access-Ability Committee and Sports and Recreation Advisory Committee.

What the Community Said About Spani

The project generated considerable interest, with more than 675 survey responses and 1,700 visits to the engagement webpage. About half of the respondents said they use the pool at least once a month. 

While survey respondents place a high value on Spani’s forested setting in Mundy Park, they indicated concern about inadequate changerooms and washrooms, limited play features and interest in expanded picnic space and seating. Improvements to these features would help draw them to the pool, along with a covered/shaded area, shallow beach entry and enhanced natural landscaping inspired by Mundy Park.

Expanded Programming and Accessibility 

Armed with the community’s feedback, staff are preparing a detailed design to present to Council in early 2022 based on a vision of Spani as a summer retreat in a forested setting with swimming and leisure opportunities for all residents. The expanded facility will be more inclusive for all ages and abilities, and maximize the range of aquatic lessons and programming offerings. 

Proposed features will include: 

  • A shallow beach entry, splash area, lazy river and separate hot pool;
  • A 1.2-metre deep end for fun activities for children and youth, a warm-up area during swim meets and a back-up lap swimming area;
  • Accessible universal changerooms and year-round accessible public washrooms;
  • A servery; and
  • An indoor multi-purpose room for year-round programming.

Facility Upgrades to Improve Accessibility, Efficiency

The project will include reconstructing the buildings on site and renovating the existing tank, gutter system and decking. A new building location will allow for a more accessible and efficient pick-up and drop-off area, and the sidewalk will be extended from the bus stop to improve access to transit users.

To improve energy efficiency and manage greenhouse gas emissions, the facility will make use of sustainable technologies such as solar thermal, sanitary heat recovery, an air source heat pump and high-efficiency gas boilers.

The current Capital Plan includes $8 million for the project, and the City has also sought provincial and federal infrastructure funding. Completing the project in a single phase is estimated to cost $18 million. 

The renewal of Spani Pool is a key project in the City’s upcoming Major Recreation and Cultural Facilities Roadmap (MRCFR), a high-level document that will provide transparency for taxpayers by outlining the anticipated scheduling and costs to build, staff and operate City facilities. The draft MRCFR is expected to be presented to Council this summer. 

Stay Informed

For updates on this project, visit www.letstalkcoquitlam.ca/spani and subscribe to the email list.

Coquitlam residents and businesses are also encouraged to follow the City of Coquitlam on social media (FacebookInstagram and Twitter) and download the CoquitlamConnect mobile app for up-to-date City information. Links are available at www.coquitlam.ca/connect.

Media contact:
Ted Uhrich
Project Manager Strategic & Capital Projects
City of Coquitlam
604-927-6710
tuhrich@coquitlam.ca 

Additional Info...
Facebook Twitter Email

Other News in City News

A photo of the mural called

Art on the Move – Discover Coquitlam’s New Public Art Tour

Posted on: May 1, 2025 | Last Modified on: May 1, 2025
A large crowd gathers at an outdoor event during twilight to watch fireworks, with city buildings in

Partner with Coquitlam and Make a Lasting Impact

Posted on: April 23, 2025 | Last Modified on: April 23, 2025
Park Spark team member with residents in park observing flaura

Coquitlam Celebrates Earth Day

Posted on: April 14, 2025
Hand holding cell phone with Coquitlam Curbside Collection App on screen

Go Green and Opt Out of the Paper Collection Calendar

Posted on: March 21, 2025 | Last Modified on: March 21, 2025
A young bear cub eating trash out of a black garbage bag

Help Bears Find Natural Food Sources

Posted on: March 12, 2025
Little library

Apply for a Neighbourhood Small Grant

Posted on: March 6, 2025 | Last Modified on: March 6, 2025
Public works staff unspooling a cable/hose

Utility Bills Are in the Mail

Posted on: February 26, 2025
Public Service Advisory Graphic

Public Service Advisory: Coquitlam Prepared for Winter Weather

Posted on: January 30, 2025 | Last Modified on: January 30, 2025
Lafarge Lake at dusk with a sunset and seasonal light display

Coquitlam Winter Holiday Hours

Posted on: December 20, 2024 | Last Modified on: December 20, 2024
Public Service Announcement graphic

PSA: Financial Aid Available for Eligible Flood-impacted Residents and Businesses

Posted on: December 9, 2024 | Last Modified on: December 9, 2024
A photo of the mural

New Mural Project Brings City Council, Youth and United Way BC Together

Posted on: December 4, 2024 | Last Modified on: December 4, 2024
Truck decalled with

Coquitlam’s New Garbage Collection Fleet is Wrapped for Education

Posted on: November 21, 2024 | Last Modified on: November 21, 2024
Sequoia Tree Transplant near Lafarge Lake

City Grows its Family of Trees

Posted on: October 2, 2024
Cyclists at HUB Cycling Celebration Station Burquitlam Station

Join Coquitlam during Go by Bike Week

Posted on: September 20, 2024
Bylaw enforcement office chatting with driver of vehicle in a school loading zone

Stay Alert for Back-to-School Students

Posted on: August 28, 2024
Fire Risk Rating Gauge. Current level is high.

Coquitlam Ramps Up Fire Prevention Measures in Parks and Green Spaces

Posted on: July 11, 2024 | Last Modified on: July 11, 2024
Mundy Park 3 - Newsflash

Mundy Park Pool Update

Posted on: July 11, 2024
Be fire safe during home renovation and construction

Reduce Fire Risks during Summer Renovation Projects

Posted on: June 24, 2024 | Last Modified on: June 24, 2024
Rocking horse for sale along with other knick knacks.

City-Wide Garage Sale and Giveaway Event this Weekend

Posted on: May 24, 2024 | Last Modified on: May 24, 2024
Hand holds a credit card hovering over a keyboard

Property Tax Notices Are in the Mail

Posted on: May 22, 2024 | Last Modified on: May 22, 2024